岛国av无码免费无禁网站_欧美亚洲永久在线_亚洲无码一级黄片大全_亚洲福利在线无码天天看

歡迎訪問(wèn)衡水中景機(jī)械設(shè)備有限公司網(wǎng)站 鋼筋套筒 直螺紋套筒 冷擠壓套筒 鋼筋滾絲機(jī)! 網(wǎng)站首頁(yè) | 網(wǎng)站地圖 | 阿里巴巴店鋪
熱門關(guān)鍵詞: 鋼筋連接套筒 直螺紋鋼筋套筒 冷擠壓鋼筋套筒 可焊接鋼筋套筒 變徑鋼筋套筒 灌漿套筒
欄目導(dǎo)航
咨詢熱線:15614883666
新聞中心

您的位置:首頁(yè)>>新聞中心

ZJ-50小霸王鋼筋直螺紋滾絲機(jī)使用說(shuō)明書(shū)

作者:超級(jí)管理員來(lái)源:本站發(fā)布時(shí)間:2024-11-12 15:17:04點(diǎn)擊數(shù):0 次

ZJ-50小霸王鋼筋直螺紋滾絲機(jī)使用說(shuō)明書(shū)

型號(hào)

Model

ZJ-50

鋼筋直徑范圍

rebar diameter range

Ф12-Ф40mm

主電機(jī)功率

Main motor power

7.5KW

**螺紋長(zhǎng)度

maximum thread length

90mm

配用電源

Power supply

380V

       

weight

320KG

電源頻率

Power frequency

50HZ

號(hào)

factory number

0205009

主軸轉(zhuǎn)速

Spindle speed

73r/min

 factory date

20246

June 2024

 image.png

 

設(shè)備安全操作注意事項(xiàng):

Precautions for safe operation of equipment:

鋼筋剝肋滾絲機(jī)在使用過(guò)程中應(yīng)注意以下安全事項(xiàng):

The following safety precautions shall be paid attention to during the use of the rib stripping and rolling machine:

 

1、施工人員必須進(jìn)行技術(shù)培訓(xùn),經(jīng)考核合格后方可持證上崗操作。

1. Construction personnel must be provided with technical training and can only work with certificate after passing the examination.

2、設(shè)備電源必須有漏電保護(hù)裝置;本機(jī)必須有可靠的接地操作,防止漏電傷人;設(shè)備停用后應(yīng)切斷設(shè)備電源。

2. The power supply of the equipment must have leakage protection device; the machine must have reliable grounding operation to prevent the leakage from hurting people; the power supply of the equipment shall be cut off after the equipment is out of service.

3、滾絲頭滾到前限位后不停機(jī)時(shí)應(yīng)立即切斷電源,不要用手去阻止?jié)L絲頭轉(zhuǎn)動(dòng)。

3. The power supply shall be cut off immediately when the rolling head does not stop after rolling to the front limit position. Do not use hands to prevent the rolling head from rotating.

4、滾絲頭在運(yùn)轉(zhuǎn)過(guò)程中手不得觸摸任何轉(zhuǎn)動(dòng)部件,如:滾絲頭、脹刀觸頭等。

4. The rolling head shall not touch any rotating parts during operation, such as the rolling head, expanding knife contact, etc.

5、設(shè)備維修必須有專門人員進(jìn)行,不得私自進(jìn)行維修,改裝。

5. The equipment maintenance must be carried out by special personnel, and it is not allowed to carry out maintenance or modification without permission.

6、設(shè)備在接通電源后不得用手觸摸任何帶電電器件,以防觸電。不得讓水等具有導(dǎo)電能力的物質(zhì)進(jìn)行電器箱。

6. After the equipment is connected to the power supply, it is not allowed to touch any live electrical parts by hand to prevent electric shock. Do not allow water and other conductive materials to carry on the electrical box.



相關(guān)文章